Optimization of a bio-decontamination process: atomized hydrogen peroxide new cycle development method

Risk-based cycle development, considering not only the required decontamination level but the type of load and cycle total time

Atomized hydrogen peroxide requires a methodical positioning of the load to achieve a correct decontamination. According to GMP regulations, it is recommended to develop a recipe for each load and register every load pattern used.

Changes on load pattern can reduce efficacy or efficiency in the cycle. To ensure effectiveness in bio-decontamination cycles, a specific cycle development for the target load is required.

This article details how a cycle development is performed in a case when a change of production procedure takes place introducing non-validated loads inside an isolator.

Click here to read the case study

For more information please contact: pr@telstar.com